GOs

Search:  
Sl.No Date Number Subject View File
1 02/04/2019 RT-98 Water Resources Department - Polavaram Irrigation Project - Head Works - Providing, Implementation & Maintenance of 95 Nos of CCTV Surveillance Cloud at the Polavaram Project Head Works Area in Chegondapalli (V) at Polavaram Mandal W.G. District, in lines of the Project of “CLOUD BASED IP CCTV SURVEILLANCE SYSTEM IN AP” for an amount of Rs. 5,10,93,185/- Sanction- Orders – Issued View File
2 31/01/2019 RT-85 Establishment – Water Resources Department – Sri.K.Balakrishna Murthy, Deputy Executive Engineer, PIPHW Division.No.l, Polavaram – Placing in full additional charge of the post of Executive Engineer, PIPHW Division.No.6, Purushothapatnam of PIPHW Circle, Dowlaiswaram - Orders – Issued. View File
3 31/01/2019 RT-92 Water Resources Department – Permission to Engineer-in-Chief, Polavaram Irrigation Project, Dowlaiswaram for continuation of Sri K.Sanyasayya, Officer (Retd.) Grade-A1 as liaison Officer on contract basis at A.P. Bhavan, New Delhi for a further period of one year from 01.03.2019 to 28.02.2020 – Orders – Issued. View File
4 29/01/2019 RT-72 Establishment – Water Resources Department – A.P.I.E.S – Deputy Executive Engineers – Sri J.Subrahmanyeswara Rao, Deputy Executive Engineer (Retired on 30.6.2018) - Appointment as Engineering Consultant for the prestigious Polavaram Project (Head Works) for one year – Permission Accorded - Orders issued. View File
5 28/01/2019 RT-69 Water Resources Department - Accorded an administrative sanction to the Engineer-in-Chief, Polavaram Irrigation Project, Dowlaiswaram for an amount of 9,10,000/- (Rupees Nine lakhs Ten Thousand only) for procurement of Wireless system and meteorological equipment at the project site for Bhupathipalem Reservoir Project in Bhupathipalem (V) in Rampachodavaram (M) in East Godavari District - Order - Issued. View File
6 28/01/2019 RT-900 Water Resources Department - Detailed Investigation, Designs and Construction of lift Irrigation Scheme for Drawl And Lifting of water from River Godavari near Purushothapatnam Village in Seethanagaram (M) E. G District and dropping into Polavaram Irrigation Project Lift Main Canal @Km 1.800 in stage-1 and Lifting of water from left main canal@ Km 57.885 to Yeleru Reservoir in stage-II with Components such as construction of Pump Houses,associated Civil, Hydro Mechanical, Electro laying of MS Pressure Mains, Construction of Delivery Cisterns,Operation and Maintenance of entire system complete for Providing Irrigation Facilities,domestic and industrial needs of Vizag city of Uttarandhra Sujala Sravanthi to achieve early benefits”- HTCC charges for an amount of Rs.16,556.00 Lakhs for the year 2018-19- Administrative Sanction-Orders – Issued. View File
7 24/01/2019 RT-889 Water Resources Department - “Polavaram Irrigation Project Head Works –Hon’ble Chief Minister of Andhra Pradesh visit to West Godavari on 11.06.2018 to visit Polavaram Irrigation Project Works & Review meeting Expenditure incurred – Permission for payment and credit the expenditure into Collectors Protocol account for an amount of Rs. 1,47,413/-(Rupees One Lakhs Forty Seven Thousand Four Hundred and Thirteen only ) – Sanction - Orders – Issued. View File
8 21/12/2018 RT-886 Water Resources Department - Construction of National Highway crossing Bridge of 6 lane and additional 2 lane service road bridge on either side @ Km.33.559 of Polavaram Irrigation Project Left Main Canal near Murari (V) of Gandepalli (M) in East Godavari District, Andhra Pradesh (NH–16 at Km.887.615) with approach roads connecting to existing 4 Lane NH Road canal excavation and canal CC lining – Revised orders for an amount of Rs.39,57,92,821/- in lieu of Rs.38,90,99,772/- Orders – Issued. View File
9 21/12/2018 RT-887 Water Resources Department – Permission accorded to the Engineer – in – Chief (Admin), Water Resources Department, Vijayawada for shifting of PIP Head Works Circle Office from Dowlaiswaram to Polavaram -Ratification Orders – Issued. View File
10 10/12/2018 RT-713 Water Resources Department- EPC Turnkey system – Major Irrigation-“New formation of Necklace bund in Polavaram Village of Polavaram Mandal of W.G. District” part of work in “Raising and widening of A.G.L.B. to 1986 standards from KM. 0.00 to 32.00 and A.G.R.B. from KM. 0.00 to 3.025 (New formation) and in bet. KM. 0.00 to 40.20 and to protect the Necklace bund in Polavaram Village limits in bet. KM. 37.400 to 40.120 including formation of B.T. Road, Protection works and reconstruction/remodeling of existing structures – EPC Package No. 11 – Entrustment of part work under 60C – Ratification - Orders – Issued. View File
11 15/11/2018 RT-820 Establishment – Water Resources Department – APES - Sri P.C.Raghu Ram, Executive Engineer, PIPHW Division No.6, Purushothapatnam under the control of Chief Engineer, PIP(HW) Polavaram – Voluntary Retirement from Service w.e.f 30.11.2018 – Permission Accorded – Orders – Issued. View File
12 09/10/2018 G.O.RT.No. 700 Establishment-Water Resources Department-APIES-Sri K.Laxmi Reddy, Deputy Chief Engineer-II of Polavaram Irrigation Project, Dowlaiswaram-Transferred and posted as Executive Engineer, Irrigation Division, Ongole - Orders-Issued. View File
13 03/10/2018 G.O.Rt.No.690 Water Resources Department-Accorded an administrative approval to the Engineer- in - Chief, Polavaram Irrigation Project, Dowlaiswaram, for an amount of Rs. 77,45,000/- (Rupees Seventy Seven lakhs Forty Five thousand only) towards actual amount payable to the agencies for providing Lascars for water regulation of Polavaram Irrigation Project Right Main Canal during Khariff 2017 treating as a special case - Orders - Issued. View File
14 26/09/2018 G.O.RT.No. 665 Establishment-Water Resources Department-APES-Sri P.Rajeswara Reddy Superintending Engineer (Waiting for postings)-Posted as Superintending Engineer, DPM & Mechanical Circle, Polavaram - Orders-Issued View File
15 24/09/2018 G.O.RT.No. 660 Water Resources Department-Providing link canal from Polavaram Right Main Canal at Km 137.290 to Eluru Canal at Km.36.000 through existing vagu course for stabilization of 80,000 acres under Eluru canal in Krishna & West Godavari Districts for an amount of Rs. Rs.15.35 Crores (Rupees Fifteen Crores and Thirty Five Lakhs only ) Administrative sanction - Accorded- Orders-Issued. View File
16 20/09/2018 G.O.RT.No. 656 Water Resources Department- Construction of office complex, Superintending Engineer/ Executive Engineer/ Deputy Executive Engineer residential quarters for the staff of PIP, Polvaram including borewells and its connections and formation of internal roads for office complex at Polavaram, West Godavari District-€“ Revised Administrative Sanction for an amount of Rs 415.89 lakhs - Accorded- Orders-Issued. View File
17 07/09/2018 G.O.RT.No. 624 Polavaram Irrigation Project - Investigation, survey, preparation of designs & drawings and LP schedules etc., (Balance) and (1) construction of Earth Dam Gaps I & III, Earth cum rock fill dam for Gap- II, Spill channel, Approach channel and Plot channel (2) Construction of Spillway with crest level + 25.72 m and its ancillary works and (3) Excavation of foundations of 960 MW Hydro Electric Power House, Approach channel, Intake structure, Tail race pool, Tail racer channel etc., of Polavaram Irrigation Project on EPC turnkey including O &M-€- Relaxation of 47 clause of GCC - Orders - Issued. View File
18 27/08/2018 G.O.RT.No. 601 Establishment-Water Resource Department-A.P.E.S.-Sri V.S. Ramesh Babu, In-charge Superintending Engineer (Retired) and appointed as Appointed as Advisor, Polavaram Irrigation Project-Extension of contract of services for another year w.e.f 01.05.2018 to 30.04.2019 - Orders-Issued. View File
19 23/08/2018 G.O.RT.No. 598 Establishment-Water Resources Department - A.P.E.S.-Sri V.Krishna Rao, Executive Engineer, Designs Division, Pulichinatala Project Circle, Jaggaiahpeta presently working as Liaison Officer and Special Officer in New Delhi- Diversion of the post of Executive Engineer, Designs Division, Pulichntala Project Circle, Jaggaiahpet, to New Delhi and kept under the control of Engineer -€“in--Chief , Polavaram Irrigation Project, Dowlaiswaram -€“Orders -€“Issued. View File
20 21/08/2018 G.O.RT.No. 593 Polavaram Irrigation Project - Conducting explorations, excavation, transplantation of temples, sculptures etc. from the submergible areas of Polavaram Project-Sanction-Accorded-Corrections in Head of Account- Amendment to G.O.Rt No. 272, Water Resources (Proj.I.A2) Department, dated. 07-06-2017-Orders-Issued. View File
21 17/08/2018 G.O.RT.No. 585 Water Resources Department-Polavaram Irrigation Project Right Main Canal -€” Package No. 1 to 7 - Survey and leveling operations estimate for the investigation of Distributory system of Polavaram Irrigation Project Right Main Canal from Km. 0.000 to Km. 174.000 in West Godavari and Krishna District with drip irrigation system -€”Administrative Sanction-Accorded- Orders-Issued. View File
22 17/08/2018 G.O.RT.No. 584 Water Resources Department-Polavaram Irrigation Project Left Main Canal- Survey and leveling operations estimate for the investigation of Distributory system of Polavaram Irrigation Project Left Main Canal for 2,71,000 Acres in East Godavari and Vishakapatnam with drip irrigation system-Administrative sanction- Accorded- Orders-Issued. View File
23 10/08/2018 G.O.RT.No. 562 Establishment-€“ Water Resources Department - G.P.F.- Part-final withdrawal of Rs.7,40,0000 from GPF Account.No.35691-PW of Sri M.Venkateswara Rao, Engineerin- Chief, Polavaram Irrigation Project, Dowlaiswaram, Water Resources Department to meet the expenses in connection with the marriage of his son-Sanction-Orders - Issued. View File
24 09/08/2018 G.O.MS.No. 89 Water Resources Department- Conducting detailed Investigation, Preparation of Hydraulic Particulars, Designs and Engineering, Preparation of estimates and excavation of Main canal formation of banks including canal lining and construction of CM & CD works from Km 51.600 to Km 69.145 (+1009 m ) of Left main canal of Polavaram Irrigation Project Left Main Canal-Package No.3 on EPC Turnkey system-€- Deletion of construction of 4-Lane Bridges across National Highway (NH16) crossings at km 55.410 / km 54.407 (old) and km 64.375/ km 66.213 (old) on PIPLMC Pack 3 and entrustment to other Agency-Ratification of the action of the Engineer-in-Chief, PIP in entrusting the work of NH bridge at Km 55.410 to the New agency through tender process and for other 8 NH crossing permission to go for tenders so as to take up the work on priority and complete by December, 2018-Accorded- Orders-Issued. View File
25 09/08/2018 G.O.RT.No. 554 Water Resources Department - Minor Irrigation -€“Krishna District-Neeru- Chettu Programme-Estimate for -€œLifting of water from RMC Canal to feed peta tank, desilting of tank bed and improvements to feeder channel from RMC of Polavaram canal to Peta tank, Atukuru(V) and lifting of water from Eluru canal to Koneru tank in Atukuru(V) in Unguturu(M) in Krishna District-€ Administrative sanction for an amount of Rs.125.00 Lakhs - Accorded - Orders - Issued . View File
26 09/08/2018 G.O.Rt.No.561 Water Resources Department- Polavaram Irrigation Project Head Works-Package No.62-Investigation, Soil exploration, preparation of designs, drawings and detailed estimates for the construction of Right Flank regulator and off take regulator, saddle dam--€œE-€ & saddle dam -€œF-€ including its construction for Right side connectives of Polavaram Irrigation Project on EPC Turn Key system-Permission to deposit the money with CWPRS, PUNE for Conducting Hydraulic model studies on Right flank Head (P) Regulator with 1:20 scale-2D Model Studies-Accorded- Orders - Issued. View File
27 09/08/2018 G.O.MS.No. 90 Water Resources Department- Construction of National Highway crossing of 6 Lane Bridge and additional 2 Lane Service road bridges on either side @ Km.55.410 of Polavaram Irrigation Project Left Main Canal near Burugupudi (V) of Kirlampudi (M) in East Godavari District, Andhra Pradesh (NH-16 at Km.867) with approach roads connecting to existing 4 Lane NH road, Canal Excavation and canal lining and Box culvert-Revised Administrative sanction -Orders-Issued. View File
28 01/08/2018 G.O.RT.No. 536 Establishment-Water Resources Department - A.P.E.S.-Sri.M.Venkateswara Rao, Engineer-in-Chief, Polavaram Irrigation Project, Dowlaiswaram-Permission to Surrender fifteen days of Earned Leave with effect from 15.06.2018 for encashment during the Financial Year 2018-2019-Orders -€“Issued. View File
29 25/07/2018 G.O.RT.No. 526 Water Resources Department-Establishment of Five R&R Units at Rampachodavaram, Yetapaka, Chinthuru in East Godavari and at Polavaram, K.R.Puram in West Godavari District for Rehabilitation & Resettlement (R&R) with respect of Polavaram Irrigation Project for a period of two years-Permission accorded-Orders-Issued. View File
30 19/07/2018 G.O.RT.No. 511 Water Resources Department- Polavaram Irrigation Project Head Works-Visits of Hon-€™ble Chief Minister of Andhra Pradesh on inspection of Polaaram Irrigation Project, Polavaram, West Godavari District on 01.02.2017, 17.04.2017, 22.05.2017 & 08.06.2017- Submission of POL and Hire expenditure and other Expenditures and Other Vouchers-Payment of bills for an amount of Rs.7,38,602/-Sanction - Orders - Issued. View File
31 13/07/2018 G.O.MS.No. 72 Water Resources Department- Construction of National Highway crossing Bridge of 6 lane and additional 2 lane service road bridge on either side @ Km.33.559 of Polavaram Irrigation Project Left Main Canal near Murari (V) of Gandepalli (M) in East Godavari District, Andhra Pradesh (NH - 16 at Km.887.615) with approach roads connecting to existing 4 Lane NH Road canal excavation and canal CC lining - Revised administrative sanction for an amount of Rs.38,90,99,772/-Orders-Issued. View File
32 13/07/2018 G.O.MS.No. 73 Water Resources Department- Construction of NH Crossing of 6 Lane and additional 2 Lane Service road bridge either side @Km.41.560 of Polavaram Irrigation Project Left Main Canal near Mallepalli (V) of Gandepalli (M) in East Godavari District, Andhra Pradesh (NH - 16 at Km.879.295) with approach roads connecting to existing 4 Lane NH road - Revised administrative sanction for an amount of Rs.29,85,68,939/- Orders-Issued. View File
33 10/07/2018 G.O.RT.No. 487 Water Resources Department-Polavaram Irrigation Project Left Main Canal-Package No.5 -Conducting detailed investigation, Preparation of Hydraulic Particulars, Designs and Engineering, preparation of Estimates and excavation of Main Canal formation of banks including canal lining and Construction of CM & CD works of Package No.5 from Km: 93.70 to 111.00 +487 M - works entrusted under 60 (c) to M/s PSK -HES (JV) - cost variation (structures) for the works entrusted -Sanction-Accorded- Orders - Issued. View File
34 10/07/2018 G.O.RT.No. 487 Water Resources Department-Polavaram Irrigation Project Left Main Canal-Package No.5 -Conducting detailed investigation, Preparation of Hydraulic Particulars, Designs and Engineering, preparation of Estimates and excavation of Main Canal formation of banks including canal lining and Construction of CM & CD works of Package No.5 from Km: 93.70 to 111.00 +487 M - works entrusted under 60 (c) to M/s PSK -HES (JV) - cost variation (structures) for the works entrusted -€“Sanction-Accorded- Orders - Issued. View File
35 09/07/2018 G.O.RT.No. 480 Establishment-€“Water Resources Department - SriV.S.RameshBabu, Retired In-charge Superintending Engineer, Polavaram Irrigation Project Head works Circle, Dowlaiswaram - Appointed as Advisor, Polavaram Irrigation Project for a period of one year with effect from 1-5-2017- Orders-Issued. View File
36 04/07/2018 G.O.RT.No. 467 Water Resources Department - Accorded administrative approval for an amount of Rs. 4,43,50,000/- (Rupees Four Crores Forty three lakhs Fifty thousands only) to the Engineer-in-Chief, Polavaram Irrigation Project, Dowlaiswaram, for Construction of office Building for the accommodation with its two sub divisions, Mechanical sub division, Visakhapatnam -Orders-Issued. View File
37 28/06/2018 G.O.MS.No. 68 View File
38 28/06/2018 G.O.MS.No. 69 Water Resources Department - Construction of B&C type quarters for the staff of Polavaram Irrigation Project at Polavaram, West Godavari District - Revised Administrative Sanction for an amount of Rs.493.998 lakhs - Accorded- Orders - Issued. View File
39 28/06/2018 G.O.MS.No. 68 Water Resources Department - Construction of A- type quarters for the staff of Polavaram Irrigation Project at Polavaram, West Godavari District-Revised Administrative Sanction for an amount of Rs 443.719 lakhs - Accorded- Orders-Issued. View File
40 30/05/2018 G.O.RT.No. 381 Water Resources Department - PIP - Investigation, Survey Preparation of Designs & Drawings and L.P Schedules etc., (Balance) and (1) Construction of Earth Dam Gaps I & III, Earth Cum Rock Fill Dam for Gap-II, Spill Channel, Approach Channel and Pilot Channel; (2) Construction of Spillway with crest level +25.72 m and its ancillary works and (3) Excavation of foundations of 960 MW Hydro Electric Power House, Approach Channel, Intake structure, Tail race pool, Tail race channel etc., of Polavaram Irrigation Project on EPC Turn key including O & M - Enhancement of Special Imprest amount from Rs.160 Crores to Rs.170 Crores with the Superintending Engineer, Polavaram Irrigation Project Head Works Circle, Dowlaiswaram - Orders - Issued. View File
41 22/05/2018 G.O.RT.No. 366 Water Resources Department- Polavaram Irrigation Project Left Main Canal- Conducting Detailed Investigation, preparation of Hydraulic particulars, designs and Engineering, preparation of estimates and execution of Main Canal, formation of banks including canal lining and Construction of CM&CD works from KM 93.700 to KM 111.000+487 m of Polavaram Irrigation Project Left Main Canal(Package- 5)-part work entrusted to M/s PSK-HES(JV)-Rate for Blasting in HDR with Muffling Arrangements - Permission-Accorded- Orders - Issued. View File
42 11/05/2018 G.O.RT.No. 349 Water Resources Department- PIP Head works - Package Nos.66 & 67 - Construction of Saddle Dam KL (Package-66) and Construction of Navigation Canal (Package -67) - Realignment of SSSCPWS Pipe lines crossing the Saddle Dam and Navigation Canal - Proposals for shifting of Sri Satya Sai Drinking Water Supply Pipe Lines - Depositing an amount of Rs.10.50 Crores to take up the re-alignment of pipeline work - Permission- Accorded - Orders - Issued. View File
43 26/04/2018 G.O.RT.No. 298 Water Resources Department - Detailed Investigation, Designs and Construction of Lift Irrigation Scheme for Drawl and Lifting of water from River Godavari near Purushothapatnam Village in Seethanagaram (M), E.G. District, and dropping into Polavaram Irrigation Project Left Main Canal @Km 1.800 in Stage-I and Lifting of water from Left Main Canal @ Km 57.885 to Yeleru Reservoir in Stage-II with Components Such as construction of Pump Houses, associated Civil, Hydro Mechanical, Electro Mechanical Works, Construction of Electrical Sub Station including installation, Laying of MS Pressure Mains, Construction of Delivery Cisterns, Operation and Maintenance of entire system complete for providing Irrigation facilities, domestic and industrial needs of Vizag city as a part of Uttarandhra Sujala Sravanthi to achieve early benefits-€ - Deviation statement for pressure main length in Stage-II due to change in location of pump house from 57.885 km to 50.00 km of Left Main Canal thus the increase in length of pressure main comes to 6.030 Km -Ratification Orders - Issued. View File
44 19/04/2018 G.O.RT.No. 291 Water Resources Department- Polavaram Irrigation Project - Providing Drone Cameras for live shooting of Polavaram Irrigation Project Head Works - Virtual reviews and site visits by Hon-€™ble Chief Minister, Ministers and other dignitaries - Hire charges for drone - Sanction and entrustment to Sky Bird, Guntur - Accorded - Orders - Issued. View File
45 09/04/2018 G.O.RT.No.194 Water Resources Department- Polavaram Irrigation Project - Head Works - Making Logistic arrangements for Dignitaries from Government of India and various committees visiting the Polavaram Irrigation Project for the period from 01.10.2017 to 31.03.2018 Sanction - Accorded - Orders - Issued. View File
46 19/03/2018 G.O.RT.No.194 Water Resources Department- Polavaram Irrigation Project – Payment of bills towards conducting Press tour to Polavaram on Visit of Hon’ble Chief Minister of Andhra Pradesh on 30.12.2016 for Laying Concrete to Polavaram Project at Polavaram, West Godavari District – Permission- Accorded - Orders - Issued. View File
47 01/03/2018 G.O.RT.No.163 Water Resources Department- Polavaram Irrigation Project – Documentary film on Polavaram Irrigation Project by National Geographic Channel team at a cost of Rs.75.00 Lakhs - Orders - Issued. View File
48 08/02/2018 G.O.MS.No. 10 Water Resources Department –Polavaram Irrigation Project Right Main Canal- Package No. VII- Representation of G. Konduru Mandal, Velagaleru villagers request for Polavaram RMC @ Km 173.550 bridge named as late Ex Chief Minister Sri Nandamauri Taraka Rama Rao– Orders-Issued- Notified. View File
49 01/02/2018 G.O.RT.No.81 Water Resources Department – PIP – Investigation, Survey Preparation of Designs & Drawings and L.P Schedules etc., (Balance) and (1) Construction of Earth Dam Gaps I & III, Earth Cum Rock Fill Dam for GapII, Spill Channel, Approach Channel and Pilot Channel; (2) Construction of Spillway with crest level +25.72 m and its ancillary works and (3) Excavation of foundations of 960 MW Hydro Electric Power House, Approach Channel, Intake structure, Tail race pool, Tail race channel etc., of Polavaram Irrigation Project on EPC Turn key including O & M – Enhancement of Special Imprest amount from Rs.150 Crores to Rs.160 Crores with the Superintending Engineer, Polavaram Irrigation Project Head Works Circle, Dowlaiswaram – Orders – Issued. View File
50 08/01/2018 G.O.RT.No.15 Polavaram Irrigation Project – Court cases – Appeal No.116 of 2015, Appeal No.452 of 2016 and O.A.No.309 of 2015 – Appeals related to Polavaram Project – Appearance of legal team comprising of Advocate On Records and Senior Advocates before National Green Tribunal, - Approval of fee structure – Accorded – Orders - Issued. View File
51 20/12/2017 G.O.RT.No.804 Water Resources Department- Polavaram Irrigation Project – Production of documentary film of 10 minutes duration for the Government of Andhra Pradesh in English Language-Entrustment of work to least quoted agency “GIIR Communications India Pvt., Limited” – Permission- Accorded - Orders - Issued. View File
52 20/12/2017 G.O.RT.No.803 WRD- Polavaram Irrigation Project Left Main Canal Package No.3- Construction of 10 Land NH-5 Bridge on PIPLMC at Km.64.375 in Prathipadu Village – Shifting of 33 KV transmission line – Payment to APEPDCL- Ratifying the action by the Superintending Engineer, PIPLMC Circle, Tuni for depositing the requisite amount of Rs.5,65,159/- with APEPDCL– Orders – Issued. View File
53 09/12/2017 G.O.Rt.No.513 WRD, PIPRMC From Km 0.000 to Km 177.321 (7 Packages) Modification to G.O.Rt. No. 47, Water Resources (Proj.I.A2) Dept., Dt: 07.02.2017 –Orders- Issued. View File
54 09/12/2017 G.O.Rt.No.514 WRD, Conducting survey and leveling operations for the DL Road alignment and preparation of designs, drawings and estimate of CM & CD works along the DL Road from Km 2.000 to Km 24.450 of PIPRMC View File
55 16/10/2017 G.O.Rt.No.575 WRD, PIP on EPC Turn Key including O & M”- Imprest amount with the Superintending Engineer, PIP Head Works Circle, Dowlaiswaram - Orders – Issued View File
56 11/10/2017 G.O.Rt.No. 641 WRD, PIP on EPC Turn Key including O & M”- Imprest amount with the Superintending Engineer, PIP Head Works Circle, Dowlaiswaram - Orders – Issued View File
57 01/09/2017 G.O.Ms.No.02 Polavaram Irrigation Project Right main Canal- Package-VII- EWE, Forming embankment and construction of CM&CD works View File
58 14/07/2017 G.O.Rt.No. 383 WRD, PIPRMC, Package No. IV, Request for payment towards additional expenditure incurred on account of earthwork View File
59 06/07/2017 G.O.Rt.No.272 PIP- Conducting explorations, excavation, transplantation of temples, sculptures etc. from the submergible areas of PP – Sanction – Accorded – Orders – Issued. View File
60 02/07/2017 G.O.Ms.No.11 WRD, PIPRMC – Formation of double lane BT road on inspection path of Left Bank of PIPRMC from Km.2.000 to Km.25.450. Administrative sanction , Accorded - Orders – Issued. View File
61 02/07/2017 G.O.Rt.No.47 WRD, PIPRMC From Km.0.000 to Km.177.321 (7 Packages) Cement Concrete Guniting work to meet the emergency work of PIPRMC for Thammileru Aqueduct View File
62 22/06/2017 G.O.Rt.No. 305 PIPLMC, Package-1 , Request to issue suitable instructions for taking up of the work , Permission-Accorded-Orders-Issued View File
63 22/06/2017 G.O.Rt.No.320 WRD, Polavaram Project Authority (PPA) – Payment towards Hired Vehicle, Sanction ,Accorded, Orders, Issued. View File
64 13/06/2017 G.O.Rt.No.280 WRD arranging payment to AP State Fiber Net Ltd for providing necessary infrastructure for virtual review meeting by Hon’ble Chief Minister –Permission-Accorded-Orders-Issued View File
65 13/06/2017 G.O.Rt.No.286 WRD- Assurances – Construction of OT sluice to feed Kothuru Tank on Left bank of PIPRMC in West Godavari District. View File
66 13/06/2017 G.O.Rt.No.281 WRD Submission of POL and Hire expenditure and other Expenditures and Other Vouchers – Payment of bills – Request to credit expenditure amount in to Collectors account –Permission - Accorded - Orders - Issued View File
67 11/06/2017 G.O.Rt.No.624 Water Resources Department- Polavaram Irrigation Project Head Works , on contract basis for a period of one year – Orders – Issued. View File
68 11/06/2017 G.O.Ms.No.71 Water Resources Department – Polavaram Irrigation Project - Package No.67 View File
69 29/05/2017 G.O.Rt.No. 252 Permission to release of funds for payment of customs duty and clearance of Putzmister equipment for concreting works and to Recover from ensuing Bills of contractor View File
70 29/05/2017 G.O.Rt.No. 253 WRD, PIP on EPC Turn Key including O & M”- Imprest amount with the Superintending Engineer, PIP Head Works Circle, Dowlaiswaram - Orders – Issued View File
71 06/05/2017 G.O.Rt.No.263 Supply and installation of Open Channel Type Canal Flow Measuring System with Telemetry and Portable Surface Radar for PIPRMC View File
72 20/04/2017 G.O.Rt.No.191 WRD, PIPRMC Package 6- Entrusting the works to willing agency at agreement rate View File
73 18/04/2017 G O Rt. No.184 WRD, Setting up of Project Management Unit for Polavaram Project View File
74 24/03/2017 G.O.Ms.No.19 PIP,Package No.7 on EPC Turnkey system- Construction of Aqueduct and Flumed section-Additional cost due to variation in quantities-Approval View File
75 20/03/2017 G.O.Ms.No.18 WRD, PIP Setting up of Quality Control Unit for Polavaram Project Authority- Orders View File
76 11/03/2017 G.O.Rt.No.623 Water Resources Department- PIPHW – Providing Technical advise for successful commissioning Spillway radial gates of PIP View File
77 07/03/2017 G.O.Rt. No.333 WRD- Composition and constitution of an Expert Committee-Constituted-Orders-Issued View File
78 07/03/2017 G.O.Rt.No.335 WRD, Submission of proposals for crediting the expenditure incurred on Flood arrangements, POL and Hire expenditure into Collectors protocol account – Sanction - Orders - Issued. View File
79 13/02/2017 G.O.Rt.No.50 WRD, PIPRMC, Administrative sanction for Rs.881.30 lakhs for the work “Re-construction of Breached portion of Ramileru, Package-V of PIPRMC View File
80 08/02/2017 G.O.Rt.No.418 Water Resources Department- Polavaram Irrigation Project Right Main Canal- Package No. V Payment of Rs. 3,41,67,040/- towards excavation of leading channel View File
81 27/01/2017 G.O.Ms.No.09 WRD - PIPRMC- Package No. 7Estimation of canal in new alignment including excavation and formation of embankment, lining and CM & CD works in the U/s of Balerao tank to entrust the work to the existing agency M/s BSCPL Infrastructures Limited Orders – Issued. View File
82 20/01/2017 G.O.Ms.No.06 WRD, PIPRMC, Package No. 7 Permission for taking up the protection works from Km.162.625 to KM 164.750 and to entrust the work to the existing agency M/s BSCPL Infrastructures Ltd - Orders – Issued. 20-01-2017 View File
83 17/01/2017 G.O.Ms.No.05 WRD, PIPRMC, Package No. 7 Formation of new 4 lane road from Nunna to Jakkampudi village along the left side bank of PIPRMC. View File
84 21/12/2016 G.O.Ms.No.122 PIPLMC-Package-6, Proposals for release of 40% of price adjustment arrears for labour, Machinery and other materials View File
85 30/11/2016 G.O.Ms.No.113 WRD- PIPLMC – Package No.5 -Conducting detailed investigation, Preparation of Hydraulic Particulars, Designs and Engineering, preparation of Estimates View File
86 23/11/2016 G.O.Ms.No.112 Permission to provide Wireless Communication System to field staff at Inlet Arrangements of PIPRMC View File
87 21/10/2016 G.O.Rt.No.673 WRD-PIP Unit- PIPRMC- Payment of bills for preparation of 3 audio songs for Krishna Godavari Pavitra Sangamam,Accorded - Orders - Issued. View File
88 19/10/2016 G.O.Rt.No.666 WRD-PIP -Joint Survey of Submergence area in the territory of Chhattisgarh State – Deposit of amount for Joint Survey to the Government of Chhattisgarh - Permission –Accorded-Orders - Issued. View File
89 11/09/2016 G.O.Ms.No.109 WRD,PIP– Package No.62 – Investigation, soil exploration, Preparation of Designs, Drawing and detailed estimates for the construction of right flank regulator and off take regulator, Saddle dam View File
90 06/09/2016 G.O.Ms.No.38 WRD, Major Irrigation - Conducting detailed investigation of PIPRMC Amendment of G.O.Ms.No.118, dated 6.12.2016-Orders- Issued. View File
91 22/08/2016 G.O.Rt.No.590 WRD- Sri Dinesh Prasad Bhargava proposed as Technical Consultant in Polavaram Irrigation Project- Orders-Issued. View File
92 09/08/2016 G.O.Ms.No.96 PIP on EPC Turn Key including O & M – Updated estimate with SSR 2015-16” - Revised administrative sanction-Accorded View File
93 03/08/2016 G.O.Rt .No.193 WRD, in relaxation of the orders issued in Govt Memo No. 22682/Maj.Irr.1(2)/2007-4, dated. 13-09-2007-Ratified. View File
94 04/07/2016 G.O.Ms.No.45 WRD, PIPRMC, Package. III - Proposals for sanction of price adjustment arrears for labour, Machinery and other materials View File
95 04/07/2016 G.O.Ms.No. 46 WRD, PIPRMC, Package. IV , Proposals for release of price adjustment arrears for labour, Machinery and other materials View File
96 30/06/2016 G.O.Ms.No.69 WRD- Polavaram Irrigation Project- Right Main Canal Court Cases. View File
97 29/06/2016 G.O.Ms.No.70 PIP, PIPRMC, Package. I from Km.0.00 to Km.14.800 - Proposals for sanction of price adjustment arrears for labour, Machinery View File
98 18/06/2016 G.O.Ms.No. 27 WRD, PIIPRMC Package 1 to 8 , Correction requested in Head of Account to G.O. Ms. No.117, Water Resources (Proj.I.A2) Department dated.06.12.2016 – Amendment -Orders- Issued. View File
99 18/06/2016 G.O.Ms.No.66 Revised administrative approval -Amendment of G.O.Ms.No. 21, Water Resources (Proj.I.A2) Department, dated.16.02.2016 – Orders- Issued. View File
100 12/06/2016 G.O.Ms.No.118 PIPRMC Conducting detailed investigation on 7 packages, Revised administrative sanction-Accorded – Orders – Issued View File
101 12/06/2016 G.O.Ms.No.118 Conducting detailed investigation of Polavaram Irrigation Project Right Main canal View File
102 12/06/2016 G.O.Ms.No.117 PIP , Package Nos. 1 to 8 under EPC Turn Key system- Revised administrative sanction-Accorded – Orders – Issued View File
103 31/05/2016 G.O.Ms .No.64 PIP Amendment to G.O. Ms.No. 5, I & CAD (PW.M&MI-CA II) Department, dated.06.02.2013 – Orders- Issued View File
104 24/05/2016 G.O.Ms.No.57 Major Irrigation ,Amendment to the Head of Account Amendment of G.O. Ms.No. 93, I & CAD (Maj.Irr.I) Department, dated.24.05.2005 – Orders- Issued. View File
105 24/05/2016 G.O.Ms.No. 58 WRD , Major Irrigation PIPRMC Revised administrative Approval for Rs.2240.688 Cr. - Head of Account – Amendment -Orders- Issued View File
106 27/04/2016 G.O.Rt.No.287 WRD- PIP – Environmental Clearance – Conditions stipulated by MoEF – Constitution of Multi Disciplinary Committee –- Orders - Issued. View File
107 05/04/2016 G.O.Ms .No.49 PIPLMC-Package-7 ,- Release of 40% of price adjustment arrears for labour, Machinery and other materials View File
108 26/03/2016 G.O.Ms .No.44 WRD, PIPLMC ,Package III ,Release of 40% of price adjustment arrears for labour, Machinery and other materials View File
109 16/03/2016 G.O.Ms.No.39 Water Resources Department- Polavaram Irrigation Project Head Works – Right side connectivities – Package No.62 View File
110 28/02/2016 G.O.Ms.No.35 PIPRMC Permission to provide Wireless Communication System to field staff at Inlet Arrangements of Polavaram Irrigation Project Right Main Canal-Ratification View File
111 19/02/2016 G.O.Ms.No.26 PIPRMC – Administrative sanction for an amount of Rs. 40.20 lakhs – Accorded - Orders - Issued. View File
112 16/02/2016 G.O.Ms.No.21 PIPRMC, Temporary alternative arrangements to un-tackled road bridges and inletting of streams into PIPRMC View File
113 11/02/2016 G.O.Ms.No.104 WRD, Excess rate for controlled blasting over conventional excavation in Hard Rock with Normal blasting - Rate approved by the District Level Sanction committee – Administrative sanction of extra rate for controlled blasting– Orders – Issued. View File
114 30/01/2016 G.O.Rt.No.82 PIP,Appearance of legal team comprising of Advocate On Records and Senior Advocates before National Green Tribunal, – Approval of fee structure – Accorded – Orders - Issued. View File
115 25/01/2016 G.O.Ms .No.13 PIP, Proposals to expedite progress to achieve the targeted mile stone programme – Orders- Issued. View File
116 25/01/2016 G.O.Ms.No.15 PIPRMC –permission to provide Solar Lighting System and Sign Boards at temporary diversion arrangements for road crossings for an amount of Rs.41.72 lakhs – Accorded - Orders - Issued. View File
117 25/01/2016 G.O.Ms .No.13 PIP on EPC Turn Key including O&M” entrusted to M/s Transstroy – JSC – UES (JV) – Proposals to expedite progress to achieve the targeted mile stone programme – Orders- Issued. View File
118 28/12/2015 G.O.Ms.No. 237 Submission of Estimate for special repairs to spillway gates, hoist bridges & hoist equipment, walkway bridge, stoplog gates at Kovvada calva reservoir project in LND Peta View File
119 28/12/2015 G.O.Ms.No.236 PIPRMC Package No. IV – Providing GPS based hardware and soft ware system for remote monitoring of excavators to increase operational efficiency View File
120 28/11/2015 G.O.Ms.No.205 PIPRMC, Temporary alternative arrangements to un-tackled road bridges and inletting of streams into PIPRMC View File
121 25/06/2015 G.O.Ms.No.67 WRD Re-naming of “ Indira Sagar Polavaram Project” as “Polavaram Irrigation Project” View File
122 23/04/2015 G.O.Ms.No.38 ISPP- ISLMC- Distributory system- Visakhapatnam District- Estimate for survey and levelling operations estimate for the investigation of distributory system of PPLMC View File
123 24/03/2015 G.O.Rt.No.182 Polavaram Project Authority- Purchase of vehicles- Permission-Accorded-Orders-Issued. View File
124 01/01/2015 G.O.Ms.No.01 I & CAD Dept- Estimate for diversion of water from river Godavari to river Krishna through PPRMC for domestic and industrial use View File